DAY 13 - Horizontal Work
We start some bodywork and trimming to remove the elevator from the horizontal.
Sanding down the edges of the skins where overlap glass was put on.
After basic bodywork and filling, copy the hinge lines and using a high speed cutoff wheel we cut the elevator loose from the horizontal
Cutting around the elevator horns
Elevator seperated from the Horizontal. After some cleanup we will fit it to the fuselage and then work on final half-round installations and prep for primer. The Elevator will need to have the trim tab cut out and trim motor installed.