3390 Old Statenville Rd.
Valdosta, GA 31606
(229)834-8996
mail@azaleaaviation.com
WATCH US BUILD A SABERWING!!!
DAY 9 - Starting Horizontal / Vertical
Here is the assembly of the Horizontal and Vertical for our Saberwing. The laminates are 2-core-1. Two layers of glass, a 1/8 PVC core material, and final layer of glass infused in our molds. It makes for very light and strong skins. The spars are stika spruce and very strong with very little fatigue over a long time. When coated with epoxy they are very dependable.
Front spar fitted and glued into position into skins
Rear and Elevator Spars with Hinges installed and Fitted
The vertical skin with antenna installed. The spars and torque tube are also fitted and glued into position.
DAY 10